Pipeline Use Steel Edge Which Could Ensure No-Leaking And Long Life.
With Co₂ Pressurization Function.
Convenient And Flexible.
Applicable For All Kegs With Keg Spear.
Production Capacity 30-40 Kegs/Hour
Electric Or Steam Heating
Working Process
Fix The Beer Distributor--Invert The Keg On Table Board--Drain Residue--Water Rinse--Drain Off--Caustic Washing--Recycling--Hot Water Washing--Drain Off--Co₂ Pressurizing--Take The Kegs
Lead Times May Vary Contact Us For Details
*This Product Requires Co₂ (Sold Separately)
*Taxes/Tariffs/Shipping Charges May Apply
Collections: Kegging (Pro)